HOME CPMM & STANDARD Indicators

  Overall Road Rail
The "margin of error" in the table refers to absolute margin of error, at 95% level of confidence, in the mean estimates.
  2010 2011 2010 2011 2010 2011
TFI1 Time to Clear a Border Crossing Point (in hours)
Mean 8.7 7.9 6.3 6.2 22.1 22.3
Median 4.1 4.1 3.5 3.6 13.0 12.0
Margin of Error ±0.4 ±0.5 ±0.4 ±0.2 ±0.9 ±3.6
TFI2 Cost Incurred at Border Crossing Clearance (in US$)
Mean 186 156 192 148 160 223
Median 114 90 118 89 50 100
Margin of Error ±4 ±4 ±5 ±4 ±9 ±14
TFI3 Cost Incurred to Travel a Corridor Section
(in US$, per 500km per 20 ton)
Mean 712 959 758 1055 571 503
Median 405 637 382 704 508 424
Margin of Error ±29 ±27 ±38 ±33 ±27 ±23
TFI4 Speed to Travel on CAREC Corridors (in kph), SWD
Mean 23.5 21.9 24.4 24.5 22.3 17.7
Median 22.6 20.2 23.3 23.5 13.5 13.0
Margin of Error ±1.9 ±1.6 ±1.8 ±1.5 ±5.1 ±4.5
TFI5 Speed without Delay (in kph)
Mean 35.2 38.8 41.0 43.0 27.2 30.1
Median 37.5 39.9 41.9 43.5 25.3 34.3
Margin of Error ±3.3 ±2.1 ±3.8 ±1.9 ±5.5 ±5.4